Rail Express

How to make paper gangways for ‘N’ gauge

CLOSE coupling cams have done much to eliminate the unsightly gap between coach gangways, at least when trains are sitting on a length of straight track. There remains a lot of well detailed stock with no form of close coupling, and closing up the gap by fitting couplings closer to the coach body brings the problems of buffer and gangway locking on sharp curves, especially those found on ‘N’ gauge layouts.

So, how does one remove the unsightly and inconvenient gap (for our passengers and train crew), which can be as much as several scale feet wide, without having to make significant changes to the model?

Simple concertina gangway extensions or replacements can be made in a matter of a couple of hours using inexpensive materials.

You’re reading a preview, subscribe to read more.

More from Rail Express

Rail Express3 min read
Metro-Cammell Pullman Back In Action
A Metro-Cammell Pullman coach last used on the main line as a Departmental vehicle more than 40 years ago has returned to service as part of the Royal Scotsman set. No. 316, formerly named Magpie, has been rebuilt by Assenta Rail at EG Steele’s Hamil
Rail Express5 min read
Any Takers For Mk.3 EMUs?
AT THE TIME the large fleet of BR Mk.3 power door EMUs was decimated by the introduction of new trains on the enlarged Thames Link network and Anglia Main Line, modellers interested in the EMUs remained frustrated by the lack of manufacturer support.
Rail Express2 min read
0 To 60! Just How Nimble Are Today’s Locos And Units, And What’s The Quickest Off The Mark?
FOLLOWING the unexpected discovery of third-rail Class 777s being the quickest UK trains to reach 60mph (RE335) it has been my intention to track down sets rumoured to out-perform even those remarkable Merseyrail 0-60mph in 31 seconds achievements. I

Related