WHILE operating on the Severn Valley Railway as part of No. 55009’s running-in tests, several defects emerged, with the main one being a cracked silencer.
As this was a fire risk, the DPS realised there was insufficient time to deal with the problem and reluctantly had to withdraw from its inaugural