The Railway Magazine

Wagon Report

ERMEWA’S rake of JNA-T box opens fitted with intelligent wagon technology are Nos. 81 70 5500 001-9/002-7/009-2/010-0/012-6/048-0. Operated by Tarmac, the onboard diagnostic equipment monitors load-status, plus any issues around maintenance. Power for the 24 volt system is supplied from the

You’re reading a preview, subscribe to read more.

More from The Railway Magazine

The Railway Magazine3 min read
A Baker’s dozen THE WEYMOUTH TRAMWAY
IT is 25 years since the last train ran on the Weymouth Harbour Tramway and sadly more than three since its rails were finally ripped up, but the 1.25-mile line still holds a special place in the memory of many rail enthusiasts. The tramway was opene
The Railway Magazine2 min read
New Owner Develops Plans For Coatbridge Intermodal Terminal
SCOTTISH transport and logistics company Russell Group has taken over ownership of Coatbridge rail freight terminal in North Lanarkshire from Freightliner and launched a new subsidiary to focus on developing its rail freight business. As well as incr
The Railway Magazine1 min read
Grand Central Seeks More Train Paths And Station Stops
ARRIVA-OWNED open access operator Grand Central has applied to the Office of Rail and Road for permission to run two additional daily return services between Bradford and London King’s Cross, bringing the total number to six. In addition, the operato

Related